How to start a clothing brand
Fabric, fit, a size run, a tech pack and a sampling round · in the order they actually arrive, with the decisions that are expensive to change once production starts.
The order things actually happen in
- A clear idea of the garment · what it is, who wears it, what it replaces in their wardrobe.
- Fabric · sourced and in hand before anything is drawn properly.
- A pattern · from a pattern maker, in your base size.
- A toile or first sample · cheap fabric, to test the shape.
- Fit sessions · on a real body, more than once.
- A tech pack · written down, so production is repeatable.
- Grading · the pattern scaled across your size run.
- A pre-production sample, then the run.
Fabric comes before design, not after. A drape that works in a heavy twill is a different garment in a light viscose, and sourcing the fabric you imagined is often the longest lead time in the whole project.
Fabric, and why it decides everything
Fabric sets your cost, your minimum order, your lead time, your care label and how the garment ages. Three things to establish before you commit:
- Minimum order. Mills often sell by the roll, and a custom colour means a dye lot minimum that can run to hundreds of metres. Stock fabric from a converter costs more per metre and far less in total.
- Repeatability. Can you get the same fabric in six months? If not, your bestseller cannot be remade · and that is a real and common trap.
- Composition and origin. You will need both for the label, and increasingly for customers who ask.
Buy a metre and wash it the way a customer will before you make anything. Shrinkage and colour loss discovered at sample stage is a nuisance; discovered after delivery it is a recall.
Patterns, fit and the size run
Pick a base size, perfect the fit in it, then grade from there. Grading is a craft of its own · a jacket graded badly fits in the middle of the run and nowhere else.
Fit on a real person, not just a stand. Ask them to sit down, raise their arms and put a hand in the pocket. Most fit problems are invisible on a mannequin.
Then publish garment measurements, not only S/M/L. Chest, length, sleeve, in centimetres and inches. It costs you an afternoon and it is the most effective thing you can do about returns, which in clothing run between 20 and 40% depending on the category.
The tech pack, and what happens without one
A tech pack is the document a factory makes from. Without one you are not ordering a garment, you are describing one and hoping. It holds:
- a flat drawing, front and back, with callouts;
- a measurement chart with tolerances · what counts as acceptable;
- a bill of materials · fabric, thread, interlining, trims, with references;
- construction notes · seam types, stitch density, finishings;
- labelling and packing instructions.
Tolerances are the part people leave out and then argue about. "Chest 52 cm" with no tolerance means a delivery at 53.5 cm is neither right nor wrong, and you have no position.
Finding a manufacturer, and the MOQ problem
Expect the first answer to be no, or a minimum you cannot meet. Ways to improve your odds:
- Approach with a tech pack, not an idea. It signals you will not waste their time.
- Be specific about quantities, dates and your budget per unit.
- Look for studios that describe themselves as small-run, sampling or development · a different business from a volume factory.
- Reduce colourways before you reduce styles. Colour is usually what multiplies the minimum.
Visit if you possibly can, and pay for samples. A maker who has been paid promptly for sampling treats your production order differently.
Labelling, which is a legal requirement
In most markets a garment must carry fibre composition, care instructions, country of origin and the identity of the business putting it on the market · and the required wording and languages differ by country. Textile labelling is regulated, and the rules are not the same in the EU, the UK and the US.
Labels are sewn in at the factory. Getting the requirement wrong means relabelling an entire delivery by hand. Check the rules for every market you intend to sell into, with a local source · and tell the factory in the tech pack.
A realistic first drop
Three to six styles. One or two colourways each. A narrow size run. That is already twenty to forty sellable variants to photograph, name, price, store and ship.
Make slightly fewer than you think you will sell. Selling out teaches you something and costs you nothing; unsold stock teaches you the same thing and costs you the money.
What to track from day one
- A reference per style, colour and size · how to create SKU codes.
- Fabric references and suppliers, with the lot and the minimum.
- Every sample version and its feedback · the sampling guide.
- The measurement chart you approved, which is what a delivery is checked against.
- Your real landed cost · the calculator.
The tech pack, the samples and the references in one place
In Teseo a style carries its fabric, its measurements, its sample history, the supplier making it and the shoot that photographs it · so the version you approved is a fact rather than the most recent email.
Questions
What is an MOQ and how do I get around it?
Minimum order quantity · the smallest run a factory will accept, often per style and per colour, sometimes per size. Ways round it: find a studio that specialises in small runs, use stock fabric instead of a custom weave, reduce colourways rather than styles, or accept a higher unit price for a small run. What rarely works is asking a volume factory to make thirty pieces.
Do I need a pattern maker?
Yes, unless you are one. Fit is what people notice and cannot articulate, and it is a genuine craft. A good pattern maker will also save you money by telling you which details are expensive to sew.
How many sizes should I launch with?
Every size is its own stock, its own reference and its own risk. A narrow run is normal for a first drop, and extending later is much easier than cutting back. Whatever you do, publish real garment measurements, not just letters · it is the single biggest lever on returns.
Made locally or overseas?
Local usually means lower MOQs, faster rounds, easier visits and a higher unit cost. Overseas usually means the reverse, plus freight, duty and a longer feedback loop. For a first collection the speed of iteration is often worth more than the unit price · you are still finding out what you are making.